The U.S. Bankruptcy Court for the Eastern District of Wisconsin will add CM/ECF Release 5.0 and 5.1 to the live database and the new product will be ready for use on Monday, June 24, 2013. The CM/ECF system will not be available between 6:00 AM CDT on Saturday, June 22 and 6:00 AM CDT on Monday, June 24, 2013.  In addition, our external website will also not be available on Saturday, June 22 between 1:00 PM CDT and 1:30 PM CDT.

CLE Approval Letters and Outlines

Documents

Order by : Name | Date | Hits [ Ascendant ]

ljloanS.Cummings Outline 11-10-09 ljloanS.Cummings Outline 11-10-09

hot!
Date added: 11/30/2010
Date modified: 11/30/2010
Filesize: 22.16 kB
Downloads: 767

ljGoodman 5.11 ljGoodman 5.11

hot!
Date added: 11/30/2010
Date modified: 11/30/2010
Filesize: 17.69 kB
Downloads: 1358

LJB8-14 LJB8-14

hot!
Date added: 08/20/2012
Date modified: 08/20/2012
Filesize: 20.16 MB
Downloads: 176

lj91509Sections 525 Lou Jones Presentation lj91509Sections 525 Lou Jones Presentation

hot!
Date added: 11/30/2010
Date modified: 11/30/2010
Filesize: 29.88 kB
Downloads: 767

lj9-12-06-Outline lj9-12-06-Outline

hot!
Date added: 11/30/2010
Date modified: 11/30/2010
Filesize: 160.19 kB
Downloads: 489